Stone on the back face has been laid and thermalite blocks on top of that are also layed, ready for cladding on top. Visqueen protect and drain has been put on the outside of the retaining wall and land drains have been put in ready for soil to be filled back. Our part on this build isn’t far off done ✅
top of page
Post: Blog2_Post
bottom of page
Comments