Slab

The slab has had hardcore and sand put down, wacker bladed and screeded, DPC is down, R400 membrane down, 100mm insulation and then Visqueen hp vapour barrier to go on the top. All ready for the concrete slab tomorrow.


📍Weston Rhy, England