Decking
Decking completed 👍
Parquet flooring has been lifted, floor screeded, and oak flooring laid, sanded and oiled 📍Borth, Wales
Shower tray is in in one of the bathrooms, and the wall behind plastered ready for tiling, just got to wait for the pink to dry
We have lifted all the concrete from this back yard, put hardcore down, then sand and then layed over 3,500 brick paving. Black...
Decking almost finished, just tensile wire to go across the front and steps either side, but other than that, looking good 👍...
Flooring and skirting down in penrhyncoch in bathroom, hall, diner/lounge/ kitchen and pantry and utility room.
Today we have blocked up the garage door as no longer will be needed, double skin with insulation, and the put the scratch coat on the...
2 rsj’s are in and we have opened up this wall so the kitchen/diner/lounge will be a great size. 1 more rsj to go in the exterior wall to...
Stone on the back face has been laid and thermalite blocks on top of that are also layed, ready for cladding on top. Visqueen protect and...
Stone is getting there and blocks are going up on the second lift. Who can notice the unique touch we have put on one of the stones?
Ceiling joists are in a day ahead of schedule which is great news, more time on the stonework tomorrow. Second lift next week 👍 📍Weston...
Forgot to take photos before we left on Saturday so here is photos before we started this morning. Hoping to get ceiling joists on by...
Before, during and afters of making this small window into what will be double French doors
The slab has had hardcore and sand put down, wacker bladed and screeded, DPC is down, R400 membrane down, 100mm insulation and then...
Retaining wall is up, sand is down and wacker bladed ready for slab next week, and the first coat of the Visqueen axion guard had been...
Let the tanking commence 👍 📍Weston Rhyn, England
Forgot to take photos at the end of last week so here are the photos before we started yesterday morning. Quite a tricky build this one...
Three wagons full of concrete poured in the footings today. Onto the next stage 👍 📍Weston Rhyn, England